Mola Subsea Services Pte Ltd
[Vessel: Mola Madad]
Date of Completion: 06/07/2020
Work Done: Manufactured the full Hydraulic Control Panel, designed and laying of the pipeline, from the pump to the hose reel and control panel. Testing and Commissioning of the system was in perfect order.